products

Section BCP-4 (1,2x2,0)
Section BCP-4 (1,2x2,0)
Section BCP-4 (1,2x2,0)
Section BCP-4 (1,2x2,0)
# 999970

Section BCP-4 (1,2x2,0)

Mobile construction scaffolding towers are single- or multi-section tower-type structures. They are mainly used for interior finishing, installation,... See more

Mobile construction scaffolding towers are single- or multi-section tower-type structures. They are mainly used for interior finishing, installation, and repair work.

The required number of BCP-4 sections are mounted on the BCP-4 basic assembly to achieve the required working height. See the chart.

When installing 4 or more sections, a set of 4 stabilizers is required. To purchase, follow the link.


See less

Product is in stock
Price 408.00o
Delivery time: 3-5 working days

Section length (m): 2.0

Section width (m): 1.2

Section height (m): 1.2

Weight (kg): 22

Pipe diameter (mm): 42

Material: metal

Total scaffolding height: from 2.7 to 18.7 meters

Scaffolding height to supports: from 1.6 to 17.6 meters

Pipe diameter and thickness (mm): 42x1.5

Standard load on scaffolding surface (kg): 250


Easy to assemble and move with wheels

They are mainly used for interior finishing, installation, and repair work.

Products offered