products

Section BCP-3 (1,2x1,6)
Section BCP-3 (1,2x1,6)
Section BCP-3 (1,2x1,6)
Section BCP-3 (1,2x1,6)
# 999968

Section BCP-3 (1,2x1,6)

Mobile construction scaffolding towers are single- or multi-section tower-type structures. They are mainly used for interior finishing, installation,... See more

Mobile construction scaffolding towers are single- or multi-section tower-type structures. They are mainly used for interior finishing, installation, and repair work.

The required number of BCP-3 sections are mounted on the BCP-3 basic assembly to achieve the required working height. See the chart.

When installing 4 or more sections, a set of 4 stabilizers is required. To purchase, follow the link. 


See less

Product is in stock
Price 400.00o
Delivery time: 3-5 working days

Section length (m): 1.6

Section width (m): 1.2

Section height (m): 1.2

Weight (kg): 21

Pipe diameter (mm): 42

Material: metal

Total scaffolding height: from 2.7 to 15 meters

Scaffolding height to supports: from 1.6 to 13.9 meters

Pipe diameter and thickness (mm): 42x1.5

Standard load on scaffolding surface (kg): 250


Easy to assemble and move with wheels

They are mainly used for interior finishing, installation, and repair work.

Products offered