Blog

The Grada Panorama project is being built in Didi Digomi with Citadel materials

2 May
The Grada Panorama project is being built in Didi Digomi with Citadel materials

Peri's versatile Hadset alpha and Alphadeck formwork systems are used in the construction of the multifunctional site, both for the floor slabs and for forming the vertical elements.

"Dismantling and installing the Peri formwork system is so easy and fast that over time we have been able to make huge profits," says Dato Kipshidze, Project Manager at Grada Panorama.

The main objective of our company is to provide quality services to our partner companies; therefore it is important for us to ensure that each project is completed with modern and versatile systems.

Build with Citadel quality.

mahjong69 login mahjong69 alternatif master38 login master38 alternatif bosswin168 login bosswin168 alternatif cocol88 login cocol88 alternatif
mewah99 login mewah99 alternatif receh88 login receh88 alternatif sawer138 login sawer138 alternatif foya88 login foya88 alternatif mewahbet login mewahbet alternatif mantul138 login mantul138 alternatif mantul138 login mantul138 alternatif puas69 login puas69 alternatif bobo77 login bobo77 alternatif